Home Features Six most Googled kitchen renovating questions

Six most Googled kitchen renovating questions

Google is the first place many renovators turn to for help when planning a new kitchen. But the fact is, the answers it generates don’t always hit the mark. To clear up the confusion and put kitchen renovators on the right track Nouvelle Designer Kitchens managing director Mike Turner answers the six most Googled questions, with full insights shared in the latest Nouvelle blog.

How much do kitchen renovations cost?

Expect to pay between about $20,000 and $40,000 for an entry-level kitchen and $50,000 to $70,000 or more for a high-end custom kitchen, depending on the design, finishes, size and complexity.

These prices may not include demolition of an old kitchen, installation of a new one, disconnecting and reconnecting electricity and plumbing or the cost of appliances or trades, which can add $10,000 to $15,000 or more to the cost of the kitchen, depending on what’s required.

At the lower end of the scale, typically, is off-the-shelf cabinetry in standard sizes and basic finishes, like stapled chipboard and melamine, with benchtops in laminate and low-cost acrylic. Expected at the upper end of the scale is a custom kitchen designed by a trained kitchen designer tailored to the owner’s style, kitchen size and lifestyle needs using premium joinery finishes and benchtops in natural stone or porcelain and customised storage.

On-site project management, trade teams, documentation, good warranties, full insurance and after-sales service will also generally be included.

How long do kitchen renovations take?

A straightforward kitchen renovation takes around six weeks. This includes two to three weeks to strip out and prepare the site and services for installation and to install a new kitchen cabinet, then two weeks to prepare and install the benchtops and splashback.

Several factors can add to the timeline, for example, if the kitchen is being put in a new extension that needs council approval, decisions on the finishes or layout are delayed, changes are made late in the planning stage or during installation or there’s extreme weather that holds up trades. Stack up a few holdups like these and a new kitchen can run for over six months, especially if it’s not properly coordinated and managed and no adequate support or backup is available.

Who does kitchen renovations?

Kitchen renovations can be handled by a range of professionals including kitchen and interior designers, joiners/carpenters, cabinetmakers, architects and dedicated kitchen renovation companies such as Nouvelle Designer Kitchens. It can also be fully or partially done by the owner using off-the-shelf joinery from places like IKEA and Bunnings.

Whether bought off the shelf or a design professional is hired, check the completed projects and client reviews on the company or supplier’s website to ensure their style and services suit the renovation needs.

Also, be sure to ask exactly what the kitchen price includes, for example, does it include a warranty and insurance, will they handle the installation and coordinate and project manage trades? Will they design a completely new kitchen rather than just dress up existing cabinetry with new door fronts and benchtops?

How does someone do a DIY kitchen renovation?

A DIY kitchen renovation might seem like a great way to save money, but it comes with a long list of tasks and potential pitfalls. Without a designer, the layout must be made by the homeowner which can lead to less-than-optimal results.

Sourcing materials and managing suppliers will require significant time and effort as will preparing a comprehensive budget that includes all materials and trades, from demolition to finishing touches.

There’ll be the obligation to hire, coordinating and supervising each trade and handling any issues that arise. Whereas, if a kitchen-renovation firm or contractor is hired, a fixed-price contract will be received, a single point of contact for any queries, a streamlined, project-managed process and centralised warranty and insurances, saving time and stress.

Why do kitchen renovations take so long?

Kitchen renovations are complex projects requiring careful planning, skilled trades and coordination across multiple stages. Design planning can be time-consuming, especially if there’s uncertainty about materials or layout. Once the project begins, various trades, such as demolition, carpentry, electrical, plumbing and tiling, need to be scheduled and they are often well in advance. Material availability can also cause delays.

Kitchen renovations, where to start?

Start by setting a clear budget and defining what is needed for a new kitchen. Consider functionality first: what are the cooking habits, storage needs, what’s the use the space? Next, speak to a kitchen designer or browse online design tools to explore different layout and style options. It’s also worth researching appliances early on as some may require custom cabinetry.

Once a plan is made, make a design appointment and get quotes from at least two kitchen designers or contractors, making sure to read the fine print, such as what’s included in the quote, warranties, insurances and potential extra costs. Also, check their lead times for design and installation to ensure they fit into a schedule.