Why Concrete Cost Management is Necessary For Construction Projects?

by
21 March 2024

There are multiple reasons for managing the cost of concrete for a construction project. Concrete is a mixture of cement, sand gravel, and water. These ingredients are a major element in any construction project. When you know the cost of concrete, then it is possible to control the budget. 

The concrete calculator assists the builder in knowing the concrete cost for a certain project of construction. You can limit the quantity of concrete and can keep the cost of concrete in check. This would assist in reducing wastage levels of cement, sand, and gravel. These are ingredients that are commonly wasted in a contraction project.    

Budget Control

Concrete does involve a significant cost in construction projects. Effective cost management of concrete is necessary for controlling the overall costs of construction. You can calculate the cost of concrete with the proconcretecalculator for different construction projects. Budget control is an important thing for completing the project just in time. 

Mitigating Risk

Concrete cost management assists in mitigating the construction cost of a construction project. There is always a risk of overhead expenses in the construction project. The concrete calculator does assist in limiting the quantity of concrete and hence reduces risk. These risks cross a certain cost barrier and you can complete the project just in time.

To Reduce Wastage Level

To improve the overall quality of construction for a project and reduce the wastage level of construction. Wastage can be one of the overheads of construction projects. Concrete wastage can hinder to completion of construction in an allocated amount. You need to find how much does concrete cost and when it is needed to reduce wastage.  Concrete is a bottleneck that needs to be controlled for better construction quality and limiting construction costs.

Example

Find how Many Yards of Concrete are required for 1000 circular concrete slabs. You need to find the total number of yards of concrete for a construction project.

Given

Dimensions of circular concrete slabs

Diameter of circular concrete slabs = 3 ft 

Depth of concrete slabs = 20 Inches

Per Unit cost of Slab = $ 5

Number of Concrete = 1000 circular slab 

Solution

Slab Depth of concrete slabs=  20/12 = 1.67 ft 

Radius of concrete slab = 3/2 = 1.5 ft 

Area of concrete slabs  = 3.14[Radius]^2 ft^2

Area of Slab = 3.14[1.5]^ ft^2

Area of Slab = 4.71 ft^2

Volume of concrete slabs = (Depth)(Area)

Volume of concrete slabs = (1.67 ft)(4.71)

Volume of Slab= 7.86 ft^3

Volume of 1000 concrete slabs = (7.86  ft^3)(1000)

The volume of 1000 concrete slabs = 7,865.7 ft^3

As 

1 cubic yard = 27 cubic feet

the volume of 1000 Slab in yards = 7,865.7/27 

The volume of 1000 Slab in yards = 291.32 Cubic Yard

Now 

Cost of total 1000 slabs = ($5)(1,000)

Cost of total 1000 slabs  = $ 5000

The cement calculator assists the construction manager in knowing how much concrete costs and in which quantity. The concrete cost can be variable due to the changing costs of concrete and its ingredients like cement, sand, and gravel.

Conclusion

Concrete is one of the fundamental substances and its cost is variable to market forces. To complete the project just in time, it is necessary to know its cost and required quantity. Concrete is a bottleneck that needs to be controlled for better construction quality and limiting construction costs. 